Wednesday, December 26, 2018

(BAR-02) The Lifting Rocket

 The Lifting Rocket - A Scratch Design/Build: (4) 24mm Motors in a Multi Configuration Rocket

First Flight: Pending











































Wednesday, March 14, 2018

(BAR-01) X-Wing Alpha

 X-Wing Alpha - A Scratch Design/Build: D12 Power in a BT-50 Frame

1st Flight: June 30, 2022.

Stable, recovered undamaged.

 March 2018 Original Build